Project Location:

Camp Eggers – Kabul, Afghanistan

Client:

Program Manager Power Projection Enablers (PM-P2D)

Client Needs and Requirements:

The emergency back up power system supporting the Tactical Control Facility (TCF) at Camp Eggers was undersized for the growing base, and was nearing critical failure. The U.S. military required all-new electrical service and Uninteruptable Power System (UPS) to keep up with operational demands, as well as renovate the TCF and complete additional general construction to support the new equipment.

Challenges and ISI’s Response:

The Results:

ISI designed and engineered a solution for the customer that exceeded expectations and despite the end-user delays in the beginning the project was completed on-time.

The Details: