Project Location:

Area 82 – Bagram Airfield (BAF), Afghanistan

Client:

Program Manager Power Projection Enablers (PM-P2D)

Client Needs and Requirements:

The existing fuel storage tanks were not force-protection compliant, creating a safety hazard for personnel at the site.  This requirement was to replace the existing steel fuel tanks with a reinforced concrete storage vault.

Challenges and ISI’s Response:

Due to rising tensions with Pakistan, shipping through that country blocked, forcing ISI to ship the materials and equipment needed through non-traditional northern routes. Had to put temporary fueling measures in place to carry the outage. Integrating with existing equipment – the scope had to be changed numerous times as different obstacles where encountered in the existing equipment.

The Results:

In spite of material delivery issues outside of ISI’s or the client’s control, ISI was able to finish the project prior to the extended POP.

The Details: