Project Location:

Kandahar Airfiled (KAF), Afghanistan

Client:

U.S. Army Corps of Engineers (USACE) – Philadelphia District

Client Needs and Requirements:

The U.S. Army needed prime power connectivity to the helium refill facilities that are used to fuel their new camera-equipped observation blimps to be used for long-range visual surveillance critical to war-time intelligence and the safety of our forces as well as civilians in the area.

Challenges and ISI’s Response:

No special challenges were encountered with this project, and all activities were completed according to plan.

The Results:

ISI was able to provide the required power connecivity 30 days ahead of schedule, allowing for this new safety feaure to be implemented sooner than planned.

The Details: