ISI Connecting German Military To Reliable Power In Afghanistan

ISI was contracted by the German Government to provide reliable power to the German Military facility at Bagram Airfield Afghanistan.  The project is on track for a successful conclusion before the 10th of May 2019 (which concludes our contractual period of performance).  ISI designed and is installing four MV service drops from the base utility grid and stepping down via transformers and converting from 60hz to 50hz at 400V for the end user required voltage and frequency.  The included pictures show the stand-by generator and frequency converters being installed by ISI technicians. 

Menu